Sunday, August 25, 2013

2000 Jaguar S Type X200 V8 4 0L Primary timing chain Installation manual

2000 Jaguar S-Type (X200) V8-4.0L Primary timing chain Installation manual. Remove the right-hand bank primary timing chain. Install the camshaft locking tool 303-530 to the left-hand bank camshafts, aligning the shafts as necessary.Remove the tensioner assembly. 1. Remove the tensioner. 2. Remove the tensioner back-plate. Install the chain tensioning tool 303-532 to the exhaust camshaft sprocket. Reposition the sprocket (and the VVT unit) for the most advantageous position for use of the tool. Remove the tool.Install the primary chain over the crankshaft sprocket and the VVT unit sprocket. There must be no slack on the drive side of the primary chain and the VVT unit must not be rotated on the camshaft.Use a wedge 303-533 (or two if required) between the primary chain tensioner and tensioner blade, to take up the slack in the chain. Install the chain tensioner tool 303-532 to the sprocket holes. Apply force to the tool in an anticlockwise direction to tension the chain on its drive side. 2. While applying the opposing force to sprocket and chain, tighten the sprocket bolt to 120Nm.

Download: 2000 Jaguar S-Type (X200) V8-4.0L Primary timing chain Installation manual

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.